Skip the navigation bar by clicking now or hit 's'
skip the i-Guide Illinois State University Majors at Illinois State Attending Illinois State Life at Illinois State Visitors to Illinois State Illinois State A to Z Listing Illinois State Campus Map Illinois State Web site home Web and Campus Accessibility at Illinois State
 
 

North Quad Development

24A | 24B | 24D |
Return to the report card menu

Action 24A

Incorporate green space throughout the North District.

Action Steps

Progress will be measured based upon the completion of the following action steps.

Color codes for this plan's phases
Blue bullets represent the Constuction Phase. Planning
Red bullets represent the Constuction Phase. Design
Green bullets represent the Constuction Phase. Construction
  1. Action Step 01:  Review previous design studies for expanding Bone Student Center. Identify any factors that should be considered as part of this planning effort.

  2. Action Step 02:  Engage design consultants to prepare conceptual studies for expanding Bone Student Center and constructing a new north face for the building.

  3. Action Step 03:  Share results with the Capital Planning and Budget Team.

  4. Action Step 04:  Share results with the President’s Cabinet.

  5. Action Step 05:  Formalize standards for all design consultants performing work in the North District.

Scale begins at 0% minimum. 20% completed Scale ends at 100% maximum.
 

News and Updates

News and Updates Archive

There is no news items about this action. Please visit the news archive for articles about other actions.


Go back to the top of the page.

Return to the report card menu