Skip the navigation bar by clicking now or hit 's'
skip the i-Guide Illinois State University Majors at Illinois State Attending Illinois State Life at Illinois State Visitors to Illinois State Illinois State A to Z Listing Illinois State Campus Map Illinois State Web site home Web and Campus Accessibility at Illinois State
 
 

Facilities Services

15 | 29B |
Return to the report card menu
 
Facilities Planning
 

Action 15

Demolish Facilities Planning and consolidate services into the Northwest District.

 

Baseline Information

  • Presently, Facilities Planning is located at the corner of Main Street and Osage Street. It has 1,672 net assignable square feet.

Action Steps

Progress will be measured based upon the completion of the following action steps.

Color codes for this plan's phases
Blue bullets represent the Constuction Phase. Planning
Red bullets represent the Constuction Phase. Design
Green bullets represent the Constuction Phase. Construction
  1. Action Step 01:  Initiate the planning process for a new building that consolidates the various programs of Facilities Services from their six locations into a single site.

  2. Action Step 02:  Prepare an estimate of the costs associated with proceeding through preliminary design phases of planning for a new structure(s) and remodeling existing buildings.

  3. Action Step 03:  Identify a source of funding to cover the identified preliminary planning expenditures.

  4. Action Step 04:  Advertise for an architect for preliminary design. The architect would assist in preparation of the statement of program needs, identification of spaces and their size, development of a site plan on the west edge of Sugar Creek, and development of cost estimates.

  5. Action Step 05:  Prepare a Capital Budget Spreadsheet for Facilities Services Improvement that includes all anticipated expenditures, such as costs of moving, demolition, site preparation, construction and equipment.

  6. Action Step 06:  Develop a flow chart identifying the sequence of actions required in order to demolish the current Facilities Planning structure.

  7. Action Step 07:  Present the designs and recommendations prepared by the architect for Facilities Services Improvements to the Capital Planning and Budget Team.

  8. Action Step 08:  Share designs and recommendations with the Vice President for Finance and Planning.

  9. Action Step 09:  Get approval for the project.

  10. Action Step 10:  Advertise for and select architectural consultants for design of project.

  11. Action Step 11:  Begin design.

  12. Action Step 12:  Complete schematic design (25%).

  13. Action Step 13:  Complete design development (50%).

  14. Action Step 14:  Complete construction documents (75%).

  15. Action Step 15:  Bid the project.

  16. Action Step 16:  Award the project.

  17. Action Step 17:  Mobilize and begin construction.

  18. Action Step 18:  Track construction through web site updates.

  19. Action Step 19:  Complete construction.

  20. Action Step 20:  Move in.

Scale begins at 0% minimum. 0% completed Scale ends at 100% maximum.
 

News and Updates

News and Updates Archive

There is no news items about this action. Please visit the news archive for articles about other actions.


Go back to the top of the page.

Return to the report card menu