Skip the navigation bar by clicking now or hit 's'
skip the i-Guide Illinois State University Majors at Illinois State Attending Illinois State Life at Illinois State Visitors to Illinois State Illinois State A to Z Listing Illinois State Campus Map Illinois State Web site home Web and Campus Accessibility at Illinois State
 
 

Welcoming Center

28 |
Return to the report card menu

Action 28

Create a new Illinois State University Welcoming Center.

 

Baseline Information

  • The Welcoming Center will be constructed at a prominent location that will be easily accessible and visible by campus visitors. A Welcoming Center offers an opportunity to more effectively communicate the University’s values, image, and pride to alumni, guests, and friends of the University. Location options are currently being discussed.

Action Steps

Progress will be measured based upon the completion of the following action steps.

Color codes for this plan's phases
Blue bullets represent the Constuction Phase. Planning
Red bullets represent the Constuction Phase. Design
Green bullets represent the Constuction Phase. Construction
  1. Action Step 01:  Collect ideas and requirements of a Welcoming Center.

  2. Action Step 02:  Discuss various visions and options for the Center and select a single model to pursue through preplanning.

  3. Action Step 03:  Prepare a Scope Statement for a Welcoming Center that includes an outline of required spaces, units or programs to be housed in the Center, along with an estimated construction budget.

  4. Action Step 04:  Present the Scope Statement and preplanning material for the Welcoming Center to the Capital Planning and Budget Team.

  5. Action Step 05:  Share the Scope Statement and preplanning material with the President’s Cabinet.

  6. Action Step 06:  Get approval for the project.

  7. Action Step 07:  Advertise for and select architectural consultants for design of project.

  8. Action Step 08:  Begin design.

  9. Action Step 09:  Complete schematic design (25%).

  10. Action Step 10:  Complete design development (50%).

  11. Action Step 11:  Complete construction documents (75%).

  12. Action Step 12:  Bid the project.

  13. Action Step 13:  Award the project.

  14. Action Step 14:  Mobilize and begin construction.

  15. Action Step 15:  Track construction through web site updates.

  16. Action Step 16:  Complete construction.

  17. Action Step 17:  Move in.

Scale begins at 0% minimum. 5% completed Scale ends at 100% maximum.
 

News and Updates

News and Updates Archive

There is no news items about this action. Please visit the news archive for articles about other actions.


Go back to the top of the page.

Return to the report card menu